Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0812-0025-E]
Application
Transfer between station „Paral lel“ and the „Montjuïc“ hill
Country
Spain
City
Barcelona
Representative office
Conductix-Wampfler AG [D]
Operator
Barcelona Metro
Technical requirement[s]
Electrification of the interior equipment of the People Mover
Travel distance [Load]
758 m
Travel speed [Load]
36 km/h
Number of [Load]
2 - 3
Height
76 m
Max. steepness
18 %
Product[s]
Conductor Rail, Program 0812 SinglePowerLine
Number of poles
4
Collector assembly
Double collector
Additional information
System capacity: 400 passengers per direction
Single pole conductor rail preferably for straight tracks.
Special features
Main applications
Standard application data
Installation Instructions