Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Installation description
Overhead Bridge Crane outside a power plant.
Country
Czech Republic
City
Kadaň - Prunéřov
Representative office
Conductix-Wampfler s.r.o. [CZ]
Operator
ČEZ, a.s., Elektrárna Prunéřov
Technical requirement[s]
Main power supply for a Overhead Bridge Crane
System course
Linear
Travel distance [Load]
207 m [Program 0812, SinglePowerLine]
35 m [Program 0240, Festoon System]
Product[s]
• Conductor Rail, Program 0812, SinglePowerLine
• Festoon System, Program 0240
Quantity of poles
3+PE
Current
250 A
Voltage
400 V
Single pole conductor rail preferably for straight tracks
Special features
Main applications
Standard application data
Installation Instruction
Flat cable trolleys
Round cable trolleys
Accessories
1) depending on roller size/ roller material