Önerilen
Dosyayı kaldır
Dökümanı <span id="remove-document-name"></span> <span id="remove-cart-name"></span> sepetten çıkar?
Reference Report
[REF0812-0010-E]
Application
Industrial Waste water treatment
Customer
Buderus Guß, Wetzlar, Germany
Installation
Circular scraper bridge Ø 14m. Energy supply of the bridge by revolving Conductor Rail
Product
Conductor rail 0812, Aluminium with Inox, 200A, 3 poles + PE
Specific features
Special current collectors
Single pole conductor rail preferably for straight tracks.
Special features
Main applications
Standard application data
Installation Instructions